◆ Industries · Construction

Construction crew tracker & site progress

Site crews, specialty contractors, and installation teams moving between active job sites.

7 Days

Battery Life

IP65

Dust / Water

BLE 5.3

Connectivity

Multi-Tenant
Real-Time Sync
Offline-First
Site CrewsSpecialty ContractorsInstallation Teams

Construction

How iNOVAA works for construction teams

Construction runs on crews and subcontractors spread across active sites, where progress is hard to see until something is late. iNOVAA gives general contractors and specialty trades a live view of who is on which site, what stage the work is in, and how the day's hours are actually spent.

Crews wear the iNOVAA Tracker on site. It logs hands-on work automatically, keeps recording without signal on remote or underground sites, and syncs to the iNOVAA Portal — so project managers see verified progress without waiting for end-of-day reports.

Crew location & progress

See which crews are on which site and which stages are moving, updated live from the field.

Subcontractor accountability

Give every trade the same verified record of time on site and work completed.

Safety records on the job

Toolbox talks, PPE checks, and hazards are logged alongside the work itself.

§01

iNOVAA Portal

How Construction minutes become a fair efficiency number

Raw efficiency only counts hands-on-tool time. Weighted efficiency credits the ladder climbs, lifting, and positioning that make the tool time possible — pick a technician from the roster to see their exact numbers.

The formula

Efficiency % = [(W₁ × Tactive) + (W₂ × Texertion) + (W₃ × Taccess)] ÷ Ttotal × 100

app.inovaa.ai/construction

Construction — Level 3 framing

Mike Hayes · 208 min on-site

Live · Today

Raw Efficiency

48.1%

Weighted Efficiency

68.8%

Worker

Mike Hayes

Job

Level 3 framing

Total on-site

208 min

Field insight — Scaffold climbs and hauling materials are what make the build possible — weighted efficiency gives that effort its due.

FAQ

Construction questions, answered

Does it work on sites with no signal?

Yes. The iNOVAA Tracker is offline-first — it keeps logging work on remote, underground, or high-rise sites and syncs as soon as it's back in range.

Can subcontractors use iNOVAA too?

Yes. Each subcontractor can have its own crews and records while the general contractor sees the combined progress across the whole project.

Book a call

Ready to see your crews on one live record?

20 minutes, on a job that looks like yours.

Book a call